Skip to main content

A full building permit has been issued for the construction of 1400 S. Wabash. Set to take over space between S. Wabash Avenue and CTA L lanes at E. 14th Street, the project is already under construction after obtaining foundation permits Posted in December 2021. CMK is leading the development of the property.

1400 S. Wabash AvenuePappagebarley Haymes

With a design by Pappageorge Haymes Partners, the building will rise 305 feet over 30 stories. The project will offer 299 rental apartments with retail space on the ground floor. Residents will choose from a mix of bachelor, one-bed, two-bed and three-bed configurations, and will have 105 car parking spaces and 180 bicycle parking spaces. Amenities will be located on the top floor with an outdoor terrace.


1400 S. Wabash Avenue Site Plan Pappagebarley Haymes

The development will use the 14th Street easement to create a parking area with access to the parking levels and loading dock. The residential entrance will face north towards the car lot with a small pocket park taking up space between it and the next property. The retail spaces will face S. Wabash Avenue.

With full planning permission in hand, general contractor Lendlease Construction can continue construction to completion. The work should be completed in 2023.


1400 S. Wabash Avenue SitePappagebarley Haymes